What actually goes in a New Zealand handover pack
The compliance half, the trade half, and the four things almost every pack leaves out — starting with the maintenance schedule that stops the phone ringing.
Guides
Written for New Zealand residential builders and small developers, by people who run three companies on the same problems. No jargon, no legal theatre — just what the job actually requires.
The compliance half, the trade half, and the four things almost every pack leaves out — starting with the maintenance schedule that stops the phone ringing.
What the Construction Contracts Act requires a payment claim to contain, the 20 working day rule in both directions, and why an ignored claim that was served properly becomes a debt.
Four different clocks start at handover. Your contract, the Building Act's 12-month repair period, the 10-year implied warranties, and your guarantee product — and they are not the same thing.
Late applications, missing producer statements, inspections never closed out, as-builts that don't match consent, and the 20 working day clock that keeps stopping.
Project software for New Zealand builders and small residential developers. Daily logs, progress claims, variations, defects and handover packs — built on site by a working Auckland developer, not in a boardroom. 14 days free, no card.
See what it does