Built on site,
not in a boardroom.
Daily logs, progress claims, variations and defects if you build them. Cost tracking, feasibility and lot sales if you own them. For one to five jobs at a time — not enterprise portfolios — by a working NZ developer who runs three companies on it himself.
The sample job needs no sign-up. Rather talk it through? Book a free 15-minute walkthrough →
- 14 days free, no card
- NZ-hosted
- GST-aware throughout
Every screen exists because a real job needed it.
Most project software is built by people who've never chased a Progress Claim or argued a variation on site. Silicon Hub started as a spreadsheet replacement for one developer's own build company, then his design consultancy, then his investment arm — every screen exists because a real job needed it, not because a product roadmap said so.
Modelled on your paperwork
Not a generic project tool with construction fields bolted on — every screen follows the forms you already use.
Sized for one to five jobs
For NZ builders and small residential developers, not enterprise portfolios.
Run on three real companies
A build company, a design consultancy and an investment arm, all on the same login.
Everything from first sod to final defect, in one place.
The two marked Developer plan are the ones a Builder account does without.
Progress Claims
Modelled directly on the Master Builders RBC1 staged payments schedule — the form you're already filling in, just faster.
Cost Ledger & Budget
Every invoice against budget by category, cost centre and lot — Excl and Incl GST side by side.
Variations
Sent to the client to accept or decline online, with the approval trail kept for you.
Site Ops
Daily logs, punch lists and inspections from your phone — photos attach to the record, not a group chat.
Defects & Warranty
Every defect checked against each lot's Defects Liability Period, so nothing is missed after handover.
Feasibility & Lot Sales
Run the numbers before you commit, then track every sale, settlement and margin against the feasibility.
Multi-company, one login
A build company, a consultancy and an investment arm from one account — switch without switching tools.
Works with no signal
Photos, daily logs and cost entries save on your phone with no coverage, and upload themselves when you get back to town.
The same order your build actually happens in.
Feasibility
Run the land cost, build cost and margin before you commit — convert straight into a live project once you do.
Budget & consents
Set your cost centres, track every authority consent, and keep title and CCC documents in one checklist.
Build
Log costs as they land, claim progress payments against your staged schedule, run daily site logs and inspections.
Sell & settle
Track lot sales against feasibility and see real margin the moment a sale settles, not at year-end.
After handover
Defects liability periods track themselves per lot; a defect claim tells you straight away whether it's covered.
Two plans. Priced by what you build.
You choose when you sign up, and it decides which screens exist for the whole company — not a tier you unlock later. Every plan is the whole system for the way you work.
You own the project.
- Everything in the Builder plan, and then:
- Cost Ledger and Budget vs Actual
- Feasibility, before you commit the land
- Lot Sales, settlements and margin
- Cashflow, Funding & Loans, GST returns
- Rentals and Deals across the portfolio
- Unlimited projects and lots
- Team Members are free — you only pay for admins
You build it for someone else.
- Daily Logs, Photo Timeline, Documents
- Schedule, Inspections, Punch List
- Defects & Warranty against each DLP
- Progress Claims on the RBC1 schedule
- Variations, sent to the client to accept or decline online
- Unlimited projects and jobs
- Flat rate — add as many admins as you like
Both plans: 14 days free, no card required.
Native apps for the phone in your pocket.
Not the website in a wrapper — real iPhone and Android apps. Same login, same data.
Both apps are free, and sign in with the account you already have. Updates arrive through the App Store and Google Play like any other app.
No Google Play on your phone? Download the APK instead — you will need to allow installs from your browser once, and updates come from this page rather than the store.
Stop running your build on five different tools.
From $49 a month, excl GST. 14 days free, no card required.
Start your free trialNot ready yet? Look around a sample job · Book a walkthrough
