What actually goes in a New Zealand handover pack

Most of the arguments a builder has after a job finishes come down to one thing: nobody can find the piece of paper. Here is what belongs in the pack, and the four things almost everyone leaves out.

Written for New Zealand residential builders · Updated September 2026

A handover pack is not a formality. It is the document that decides whether the next eighteen months are quiet or whether your phone goes every second Saturday about a mark on a benchtop.

There is no single legal template for one. Your contract will set some of it, the council sets some of it, and the rest is what a reasonable builder hands over. What follows is the list that covers all three.

The compliance half

This is the part the owner's lawyer, bank or insurer will ask for, usually at the worst possible moment.

The trade half

This is the part that saves you the phone calls.

The four things most packs leave out

1. A maintenance schedule

This is the big one. A list, area by area, of what the owner has to do and how often: wash the cladding, clear the gutters, check the seals, service the ventilation, re-oil the deck.

It matters for two reasons. It is genuinely useful to the owner. And when someone comes back in year three claiming a cladding failure, the maintenance schedule you handed them — and the fact they signed for it — is the first question anyone will ask about.

Say it plainly in the pack

Many product warranties are conditional on maintenance being carried out. If the owner never washes the cladding, the manufacturer may decline the claim, and that conversation lands on you. One sentence at the top of the maintenance page prevents a great deal of grief later.

2. What the defects period actually is

Owners routinely think "12 month guarantee" means everything is free for a year, including the door they kicked and the silicone they never cleaned. Spell out what the period covers, what counts as a defect, what counts as maintenance, and how to report one. There's more on this here.

3. Who to ring, for what

One page. Emergency (burst pipe, no power), warranty claim, general question. With the name of the actual person. If you don't provide it, every one of those calls comes to you anyway, at 7pm.

4. A signed record that they got it

Date, what was handed over, who received it. This is thirty seconds of work that turns a later "I was never given that" into a non-conversation.

Digital, printed, or both

Both. Print one for the kitchen drawer — that is where people actually look. Send a digital copy too, because in three years the printed one will have gone with the previous owner and the buyer will ring you.

If you can give the owner a page they can open on their phone rather than a 60MB email attachment, do it. The attachment gets deleted; the link doesn't.

Start the pack at consent, not at practical completion

The reason handover packs take a whole weekend is that they get assembled at the end, from memory, out of a folder of photos and a pile of paper in the ute.

Nearly everything in the list above exists before the job finishes. The producer statement arrives when the engineer signs it. The paint colour is known the day it is chosen. The roofing warranty comes with the roof.

File each one against the job the day it exists and the pack builds itself. Leave it to the end and you are doing archaeology.

One thing to get right before Christmas

If you have a job settling in December, start the pack now. Suppliers shut down, engineers go on leave, and councils get slow. The producer statement you can get in ten minutes in October is a fortnight's chase in January.

The pack, built as you go

Silicon Hub assembles the handover pack from what is already on the job — spec sheet, product care, warranties, the maintenance schedule, the documents index and the photos — into one PDF, and gives the buyer their own page. It is one button instead of a weekend.

See how it works